Scope of work
- High pressure pipelines – buried and above ground.
- Cycle trail construction and maintenance.
- Drainage – panel drains, culverts, novaflow installation, sumps, surface drains and swales.
- Rising main duplication.
- Bermad installation.
- Water Treatment Plant – backwash and content tank upgrades as well as tank slabs and all connections.
- Concrete stormwater pipe.
Plant & Machinery
- 13t Sumitomo excavator with tilt hitch & 600mm auger.
- 3.5t Case excavator.
- 10t Mack 6 x 4 Tip Truck.
- 17t 3-axle tip trailer, with drop sides to use as transporter.
- Terex PT60 Positrack with bucket and grader attachements.
- 1.7t IHI excavator with 300mm auger, rock breaker and buckets.
- Plate compactor, tamper, concrete saw, generators.
- Cleveland Bucket Wheel Tencher (pictured above).
- Mini tracked dumper.
- 2023 13t CAT excavator.
Safety & Training
- SiteWise Gold 97%
- STMS & TC
- Pipe Installation Level 4
- Site Safe